GEOFLEXheat

GEOTHERMAL EXTRACTION AND UPGRADE WITH FLEXIBLE USAGE FOR INDUSTRIAL HEAT APPLICATIONS

Geothermal Extraction and Upgrade with Flexible Usage for Industrial Heat Applications

Active

Lead — Control Strategy, Sensors, Data Acquisition & Digital Twin Integration

Horizon Europe · Grant 101172780 · Coordinator: Brunel University London

The challenge

Geothermal heat can be constrained by scaling, corrosion, temperature limitations and mismatches between available heat and industrial demand. Reliable operation depends on better visibility of plant and fluid state.

How the project works

GEOFLEXheat combines heat recovery, scaling reduction, high-temperature heat pumping, thermal storage, control strategies and Digital Twin methods to deliver more flexible industrial heat.

What it delivers

  • Improved geothermal heat recovery
  • Reduced scaling impact
  • Flexible high-temperature industrial heat
  • Real-time monitoring and Digital Twin optimisation

Our contribution

Oliveris leads the monitoring and control work for GEOFLEXheat. The team defines what needs to be measured, selects and integrates the sensor suite, and develops the sensor interfaces, control logic and software needed to operate the system. Oliveris also leads the data-acquisition work that feeds live plant measurements into the project's Digital Twin and full-scale control strategy. This creates a direct link between what is happening in the geothermal plant and how the models and controls respond. Oliveris supports integration, commissioning and validation at the demonstration sites.

European Union emblem

Funded by the European Union

GEOFLEXHEAT has received funding from the European Union's Horizon Europe research and innovation programme under Grant Agreement No. 101172780.

Views and opinions expressed are however those of the author(s) only and do not necessarily reflect those of the European Union or the European Climate, Infrastructure and Environment Executive Agency (CINEA). Neither the European Union nor the granting authority can be held responsible for them.

Discuss related work

If this project is relevant to your technical challenge, talk to Oliveris about the underlying capability, integration approach or a new collaborative application.